Covering Bedlington
Our coverage around Bedlington (NE22) also includes Cramlington (3 miles to the south) and Blyth.
Projects in Northumberland are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.
Homes in the North East
In the North East, terraces, semis and bungalows all offer room to extend, with stone-built villages and conservation areas in parts of County Durham and Northumberland.
What is included in architectural design and planning in Bedlington?
Designing and building under one roof means the drawings are priced as they are drawn, so there are fewer surprises when the quote arrives. If you only need drawings and a planning application, we can do that and you are free to use any builder.
- Measured survey of the existing house
- Submission and liaison with the planning officer
- Structural engineer’s calculations
What will architectural design and planning cost?
Guide prices for architectural design and planning, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Architectural design and planning | Guide price incl. VAT |
|---|---|
| Measured survey and existing drawings | £500 to £1,200 |
| Planning drawings and application | £1,200 to £3,000 |
| Building regulations drawings and specification | £1,000 to £2,500 |
| Structural calculations | £500 to £2,000 |
Do you need permission for architectural design and planning in Bedlington?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
We confirm whether your project is permitted development, needs prior approval or needs a householder application, and prepare the right submission. A lawful development certificate is the best proof that permitted development work is lawful.
What should I think about before starting?
- Planning and building regulations are separate approvals; most projects need building regulations even when planning is not needed.
- Conservation areas and listed buildings need extra design care and supporting statements.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Architectural design and planning: common questions
Can I use your drawings with another builder?
Yes. If you buy drawings on their own, they are yours to use.
How long does planning take?
Councils aim to decide householder applications within eight weeks of validation.
Can you visit a house in Bedlington to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Other towns nearby
- Architectural design and planning in Cramlington
- Architectural design and planning in Blyth
- Architectural design and planning in Ashington
- Architectural design and planning in Morpeth
Learn more about architectural design and planning, or see every project we cover in Bedlington.

