Architectural design and planning · Coventry

Architectural design and planning in Coventry

Planning architectural design and planning in Coventry? We design and build them for houses across the West Midlands, and we fix the price for the agreed specification in writing before any building work starts.

Covering Coventry

Our coverage around Coventry (CV1) also includes Kenilworth (5 miles to the south-west) and Bedworth.

Homes in the West Midlands

Across the West Midlands, terraced and semi-detached houses in red brick are typical, along with post-war estates where garage conversions and side extensions are popular.

What is architectural design and planning?

Designing and building under one roof means the drawings are priced as they are drawn, so there are fewer surprises when the quote arrives. If you only need drawings and a planning application, we can do that and you are free to use any builder.

  • Measured survey of the existing house
  • Design options and 3D views
  • Planning or lawful development certificate drawings

What is the guide price for architectural design and planning in Coventry?

Typical ranges for architectural design and planning. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Architectural design and planningGuide price incl. VAT
Measured survey and existing drawings£500 to £1,200
Planning drawings and application£1,200 to £3,000
Building regulations drawings and specification£1,000 to £2,500
Structural calculations£500 to £2,000

What approvals does architectural design and planning need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

We confirm whether your project is permitted development, needs prior approval or needs a householder application, and prepare the right submission.

What can change the price or programme?

  • Planning and building regulations are separate approvals; most projects need building regulations even when planning is not needed.
  • Conservation areas and listed buildings need extra design care and supporting statements.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Architectural design and planning: common questions

How long does planning take?

Councils aim to decide householder applications within eight weeks of validation.

What is a lawful development certificate?

A certificate from the council confirming that work is permitted development, which is useful when you sell.

Do you work in Coventry?

Yes. Coventry is within our coverage for architectural design and planning, along with nearby Kenilworth and Bedworth.

Architectural design and planning in nearby towns

Learn more about architectural design and planning, or see every project we cover in Coventry.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote