Architectural design and planning · Havant

Architectural design and planning in Havant

We take on architectural design and planning in Havant as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Havant

Alongside Havant, we also cover Waterlooville, Portsmouth (6 miles to the south-west) and Gosport.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What does architectural design and planning involve?

Designing and building under one roof means the drawings are priced as they are drawn, so there are fewer surprises when the quote arrives. If you only need drawings and a planning application, we can do that and you are free to use any builder.

  • Measured survey of the existing house
  • Design options and 3D views
  • Submission and liaison with the planning officer

How much does architectural design and planning cost in Havant?

Typical ranges for architectural design and planning. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Architectural design and planningGuide price incl. VAT
Measured survey and existing drawings£500 to £1,200
Planning drawings and application£1,200 to £3,000
Building regulations drawings and specification£1,000 to £2,500
Structural calculations£500 to £2,000

How is architectural design and planning approved in Havant?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

We confirm whether your project is permitted development, needs prior approval or needs a householder application, and prepare the right submission.

What can affect architectural design and planning?

  • Planning and building regulations are separate approvals; most projects need building regulations even when planning is not needed.
  • Pre-application advice from the council can help on sensitive sites.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

How long does planning take?

Councils aim to decide householder applications within eight weeks of validation.

Do I need a structural engineer?

For steels, new openings, lofts and extensions, yes. We arrange the calculations.

Who deals with the council for a project in Havant?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Architectural design and planning in nearby towns

Learn more about architectural design and planning, or see every project we cover in Havant.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote