Architectural design and planning · Launceston

Architectural design and planning in Launceston

Homeowners in Launceston can get architectural design and planning from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Launceston

Alongside Launceston, we also cover Bude, Bodmin (20 miles to the south-west) and Plymouth.

Because Cornwall covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.

Homes in the South West

In the South West, matching local stone, render or slate is often the main design question, and conservation areas and listed buildings are common in historic towns.

What do you get with architectural design and planning?

Architectural design and planning covers everything before building starts: a measured survey of the house, design options, planning or permitted development drawings, the application itself, building regulations drawings and structural calculations. We offer it on its own or as part of a design-and-build project.

  • Design options and 3D views
  • Planning or lawful development certificate drawings
  • Building regulations drawings and specification

What will architectural design and planning cost?

What architectural design and planning typically cost. These are guide ranges; the written quote for your house replaces them.

Architectural design and planningGuide price incl. VAT
Measured survey and existing drawings£500 to £1,200
Planning drawings and application£1,200 to £3,000
Building regulations drawings and specification£1,000 to £2,500
Structural calculations£500 to £2,000

What approvals does architectural design and planning need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

We confirm whether your project is permitted development, needs prior approval or needs a householder application, and prepare the right submission.

What can change the price or programme?

  • Pre-application advice from the council can help on sensitive sites.
  • Conservation areas and listed buildings need extra design care and supporting statements.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

How long does planning take?

Councils aim to decide householder applications within eight weeks of validation.

What is a lawful development certificate?

A certificate from the council confirming that work is permitted development, which is useful when you sell.

How do I get a price for architectural design and planning in Launceston?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Architectural design and planning in nearby towns

Learn more about architectural design and planning, or see every project we cover in Launceston.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote