Covering Whitstable
Whitstable is about 23 miles east of Maidstone. We also cover Herne Bay (5 miles to the east), Canterbury and Faversham.
Homes in the South East
Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.
What does architectural design and planning involve?
Architectural design and planning covers everything before building starts: a measured survey of the house, design options, planning or permitted development drawings, the application itself, building regulations drawings and structural calculations. We offer it on its own or as part of a design-and-build project.
- Measured survey of the existing house
- Design options and 3D views
- Building regulations drawings and specification
What is the guide price for architectural design and planning in Whitstable?
Use these ranges to budget for architectural design and planning; the survey turns them into a fixed price for the agreed specification.
| Architectural design and planning | Guide price incl. VAT |
|---|---|
| Measured survey and existing drawings | £500 to £1,200 |
| Planning drawings and application | £1,200 to £3,000 |
| Building regulations drawings and specification | £1,000 to £2,500 |
| Structural calculations | £500 to £2,000 |
Planning and building rules in Whitstable
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
We confirm whether your project is permitted development, needs prior approval or needs a householder application, and prepare the right submission. A lawful development certificate is the best proof that permitted development work is lawful.
What can change the price or programme?
- Planning and building regulations are separate approvals; most projects need building regulations even when planning is not needed.
- Conservation areas and listed buildings need extra design care and supporting statements.
What are the steps?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
How much do extension plans cost?
Typically £3,000 to £7,000 including VAT from measured survey to building regulations drawings, plus council fees.
How long does planning take?
Councils aim to decide householder applications within eight weeks of validation.
Do you work in Whitstable?
Yes. Whitstable is within our coverage for architectural design and planning, along with nearby Herne Bay and Canterbury.
Architectural design and planning in nearby towns
- Architectural design and planning in Herne Bay
- Architectural design and planning in Canterbury
- Architectural design and planning in Faversham
- Architectural design and planning in Sittingbourne
Learn more about architectural design and planning, or see every project we cover in Whitstable.

