Covering Warminster
Alongside Warminster, we also cover Frome, Trowbridge (8 miles to the north) and Devizes.
Homes in the South West
The South West mixes stone and render cottages, Victorian terraces in the larger towns and modern estates, and many historic centres are conservation areas where materials and roof shapes are closely controlled.
What do you get with a basement conversion?
Everything below ground depends on keeping water out. We design the waterproofing system (usually a cavity drain membrane with a pump, or tanking) to the relevant British Standard guidance, then add insulation, ventilation, light and an escape route. New basements involve underpinning and a party wall process and are designed with a structural engineer.
- Damp and structural survey
- Waterproofing design and installation
- Underpinning or lowering the floor where needed
What is the guide price for a basement conversion in Warminster?
Indicative costs for basement and cellar conversions. London and the South East usually sit towards the top of each range.
| Basement and cellar conversions | Guide price incl. VAT |
|---|---|
| Existing cellar conversion | £1,900 to £3,000 per m² |
| New basement excavation | £4,200 to £6,600 per m² |
Do you need permission for a basement conversion in Warminster?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Converting an existing cellar with no external changes usually does not need planning permission in England. Digging a new basement or adding a lightwell often does, and many councils have basement policies.
What can affect a basement conversion?
- A pump for the drainage system needs a battery back-up.
- Headroom of about 2.1 m or more is needed, which may mean lowering the floor.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Does a cellar conversion need planning permission?
Usually not if nothing changes outside. New basements and lightwells often do.
How long does it take?
About 6 to 12 weeks for a cellar conversion and 16 to 30 weeks for a new basement.
How do I get a price for basement and cellar conversions in Warminster?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
- Basement and cellar conversions in Frome
- Basement and cellar conversions in Trowbridge
- Basement and cellar conversions in Devizes
- Basement and cellar conversions in Bath
Learn more about basement and cellar conversions, or see every project we cover in Warminster.

