Basement and cellar conversions · Westhoughton

Basement and cellar conversions in Westhoughton

Planning basement and cellar conversions in Westhoughton? We design and build them for houses across Greater Manchester, and we fix the price for the agreed specification in writing before any building work starts.

Covering Westhoughton

Our coverage around Westhoughton (BL5) also includes Atherton, Hindley and Tyldesley.

Homes in the North West

The North West has long rows of Victorian terraced houses in its towns and cities, alongside inter-war semis and post-war estates, so rear extensions, dormer lofts and kitchen extensions are common projects.

What do you get with a basement conversion?

Everything below ground depends on keeping water out. We design the waterproofing system (usually a cavity drain membrane with a pump, or tanking) to the relevant British Standard guidance, then add insulation, ventilation, light and an escape route. New basements involve underpinning and a party wall process and are designed with a structural engineer.

  • Underpinning or lowering the floor where needed
  • Lightwells and windows for daylight and escape
  • Ventilation, heating and electrics

How much should I budget for a basement conversion?

Typical ranges for basement and cellar conversions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Basement and cellar conversionsGuide price incl. VAT
Existing cellar conversion£1,900 to £3,000 per m²
New basement excavation£4,200 to £6,600 per m²

What approvals does a basement conversion need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

Converting an existing cellar with no external changes usually does not need planning permission in England.

What should Westhoughton homeowners check first?

  • New basements nearly always involve the Party Wall Act in England and Wales.
  • A pump for the drainage system needs a battery back-up.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Basement and cellar conversions: common questions

How long does it take?

About 6 to 12 weeks for a cellar conversion and 16 to 30 weeks for a new basement.

Will my neighbours be affected?

New basements usually need party wall agreements. We handle the notices and surveyors.

Who deals with the council for a project in Westhoughton?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about basement and cellar conversions, or see every project we cover in Westhoughton.