Covering Buckinghamshire
Our bathrooms and en-suites service in Buckinghamshire covers Milton Keynes, High Wycombe, Aylesbury and Bletchley and more.
Homes in the South East
The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.
What do you get with bathroom installation?
Bathroom installation covers stripping out the old suite, altering plumbing and wiring, waterproofing, tiling, and fitting the new bath, shower, toilet, basin and heated towel rail. We also build new en-suites and shower rooms in lofts and extensions.
- Waterproofing (tanking) of wet areas
- Tiling, sanitaryware and brassware
- Extractor fan, lighting and heated towel rail
How much should I budget for bathroom installation?
Use these ranges to budget for bathrooms and en-suites; the survey turns them into a fixed price for the agreed specification.
| Bathrooms and en-suites | Guide price incl. VAT |
|---|---|
| En-suite or shower room | £5,500 to £10,000 |
| Family bathroom refit | £7,000 to £12,000 |
| Premium bathroom or wet room | £12,000 to £20,000 |
How is bathroom installation approved in Buckinghamshire?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Bathroom refits do not need planning permission. Electrical work in bathrooms is notifiable in many cases, and new bathrooms need ventilation that meets building regulations.
What can change the price or programme?
- Low water pressure limits the choice of shower; a pump or unvented cylinder may be needed.
- Moving a toilet depends on the soil pipe route.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Bathrooms and en-suites: common questions
How long does a bathroom installation take?
One to three weeks depending on size and tiling.
Do you tank the shower area?
Yes, every wet area is waterproofed before tiling.
Do you work in Buckinghamshire?
Yes. Buckinghamshire is within our coverage for bathrooms and en-suites, along with nearby Milton Keynes and High Wycombe.
Other towns nearby
- Bathrooms and en-suites in Milton Keynes
- Bathrooms and en-suites in High Wycombe
- Bathrooms and en-suites in Aylesbury
- Bathrooms and en-suites in Bletchley
- Bathrooms and en-suites in Amersham
- Bathrooms and en-suites in Beaconsfield
- Bathrooms and en-suites in Buckingham
- Bathrooms and en-suites in Princes Risborough
Learn more about bathrooms and en-suites, or see every project we cover in Buckinghamshire.

