Covering Market Harborough
Alongside Market Harborough, we also cover Corby, Kettering (10 miles to the south-east) and Wigston.
Homes in the East Midlands
The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.
What is included in bathroom installation in Market Harborough?
Bathroom installation covers stripping out the old suite, altering plumbing and wiring, waterproofing, tiling, and fitting the new bath, shower, toilet, basin and heated towel rail. We also build new en-suites and shower rooms in lofts and extensions.
- Design and layout
- Strip-out and disposal
- Extractor fan, lighting and heated towel rail
How much should I budget for bathroom installation?
Typical ranges for bathrooms and en-suites. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Bathrooms and en-suites | Guide price incl. VAT |
|---|---|
| En-suite or shower room | £5,500 to £10,000 |
| Family bathroom refit | £7,000 to £12,000 |
| Premium bathroom or wet room | £12,000 to £20,000 |
Do you need permission for bathroom installation in Market Harborough?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
Bathroom refits do not need planning permission. Electrical work in bathrooms is notifiable in many cases, and new bathrooms need ventilation that meets building regulations.
What can affect bathroom installation?
- Moving a toilet depends on the soil pipe route.
- Large-format tiles need flat walls, which may mean re-boarding.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Your questions answered
How long does a bathroom installation take?
One to three weeks depending on size and tiling.
Can you add an en-suite to a bedroom?
Yes, if a waste route to the soil stack is possible. A macerator is an option where it is not.
How do I get a price for bathrooms and en-suites in Market Harborough?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
- Bathrooms and en-suites in Corby
- Bathrooms and en-suites in Kettering
- Bathrooms and en-suites in Wigston
- Bathrooms and en-suites in Oadby
Learn more about bathrooms and en-suites, or see every project we cover in Market Harborough.

