Bungalow and upward extensions · Ammanford

Bungalow and upward extensions in Ammanford

From the first site visit to the final building control sign-off, we manage bungalow and upward extensions in Ammanford so you only have one company to deal with.

Covering Ammanford

Our coverage around Ammanford (SA18) also includes Pontarddulais, Ystalyfera and Llanelli.

Homes in Dyfed

Across Wales you find valley terraces, coastal towns, rural stone houses and newer estates, so access, slopes and local materials all feature in the design.

What goes into an upward extension?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Structural survey of walls and foundations
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

How much should I budget for an upward extension?

Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Planning and building rules in Ammanford

Welsh projects need planning clearance from the council under Welsh rules, building regulations approval under the Welsh approved documents, and party wall notices where the work affects a neighbour’s wall or foundations.

Adding a storey in Wales needs planning permission.

What should Ammanford homeowners check first?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The house is exposed while the roof is off, so the sequence is planned tightly.

From first call to completion

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Do we need to move out?

Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.

How long does it take?

About 12 to 24 weeks on site.

How do I get a price for bungalow and upward extensions in Ammanford?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Bungalow and upward extensions in nearby towns

Learn more about bungalow and upward extensions, or see every project we cover in Ammanford.