Covering Banbury
We work in Banbury (OX16) and the places around it, including Brackley, Bicester and Daventry.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What does an upward extension involve?
An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.
- Structural survey of walls and foundations
- New first-floor structure, walls and roof
- Staircase and changes to the ground floor layout
How much should I budget for an upward extension?
Guide prices for bungalow and upward extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
How is an upward extension approved in Banbury?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.
What should I think about before starting?
- Some bungalow foundations need strengthening before a storey can be added.
- Neighbours’ light and privacy are the main planning tests.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Is an upward extension permitted development?
In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.
How long does it take?
About 12 to 24 weeks on site.
Can you visit a house in Banbury to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Bungalow and upward extensions in nearby towns
- Bungalow and upward extensions in Brackley
- Bungalow and upward extensions in Bicester
- Bungalow and upward extensions in Daventry
- Bungalow and upward extensions in Buckingham
Learn more about bungalow and upward extensions, or see every project we cover in Banbury.

