Bungalow and upward extensions · Bangor, Gwynedd and Anglesey

Bungalow and upward extensions in Bangor, Gwynedd and Anglesey

From the first site visit to the final building control sign-off, we manage bungalow and upward extensions in Bangor, Gwynedd and Anglesey so you only have one company to deal with.

Covering Bangor, Gwynedd and Anglesey

Our coverage around Bangor, Gwynedd and Anglesey (LL57) also includes Llangefni (8 miles to the west) and Caernarfon.

Homes in Gwynedd and Anglesey

Across Wales you find valley terraces, coastal towns, rural stone houses and newer estates, so access, slopes and local materials all feature in the design.

What do you get with an upward extension?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Planning and building regulations checks under Welsh rules
  • Structural survey of walls and foundations
  • Staircase and changes to the ground floor layout

What will an upward extension cost?

Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

What approvals does an upward extension need in Wales?

Welsh projects need planning clearance from the council under Welsh rules, building regulations approval under the Welsh approved documents, and party wall notices where the work affects a neighbour’s wall or foundations.

Adding a storey in Wales needs planning permission. We prepare the application with drawings showing how the new roofline fits the street.

What can change the price or programme?

  • Some bungalow foundations need strengthening before a storey can be added.
  • Neighbours’ light and privacy are the main planning tests.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

How long does it take?

About 12 to 24 weeks on site.

Can you visit a house in Bangor, Gwynedd and Anglesey to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Bungalow and upward extensions in nearby towns

Learn more about bungalow and upward extensions, or see every project we cover in Bangor.