Bungalow and upward extensions · Bloxwich

Bungalow and upward extensions in Bloxwich

From the first site visit to the final building control sign-off, we manage bungalow and upward extensions in Bloxwich so you only have one company to deal with.

Covering Bloxwich

We work in Bloxwich (WS3) and the places around it, including Walsall, Willenhall and Wednesfield.

Homes in the West Midlands

Red-brick terraces and inter-war semis make up much of the housing in the West Midlands, which suits rear extensions, dormer lofts and hip-to-gable conversions, with more modern estates on the edges of the towns.

What goes into an upward extension?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout
  • Full fit-out of the new rooms

What is the guide price for an upward extension in Bloxwich?

Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Planning and building rules in Bloxwich

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What should I think about before starting?

  • Some bungalow foundations need strengthening before a storey can be added.
  • Neighbours’ light and privacy are the main planning tests.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Do we need to move out?

Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.

How long does it take?

About 12 to 24 weeks on site.

How do I get a price for bungalow and upward extensions in Bloxwich?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Bungalow and upward extensions near Bloxwich

Learn more about bungalow and upward extensions, or see every project we cover in Bloxwich.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote