Bungalow and upward extensions · Canvey Island

Bungalow and upward extensions in Canvey Island

Bungalow and upward extensions in Canvey Island from SK Residential: design, approvals and the build handled under one contract, with one point of contact from the first visit to completion.

Covering Canvey Island

Canvey Island is about 16 miles south of Chelmsford. We also cover South Benfleet (2 miles to the north-west), Pitsea and Rayleigh.

Homes in the East of England

The East of England has a large stock of post-war and modern estate housing alongside period homes in market towns, which makes garage conversions, single-storey extensions and loft conversions popular.

What do you get with an upward extension?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Design and planning or prior approval application
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

How much does an upward extension cost in Canvey Island?

What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

What approvals does an upward extension need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.

What can change the price or programme?

  • The staircase takes space from the ground floor plan.
  • Neighbours’ light and privacy are the main planning tests.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Your questions answered

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

How long does it take?

About 12 to 24 weeks on site.

Who deals with the council for a project in Canvey Island?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Bungalow and upward extensions near Canvey Island

Learn more about bungalow and upward extensions, or see every project we cover in Canvey Island.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote