What goes into an upward extension?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Roof removal and temporary weather protection
- New first-floor structure, walls and roof
- Staircase and changes to the ground floor layout
How much should I budget for an upward extension?
What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
How is an upward extension approved in Darlington?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.
What should I think about before starting?
- The house is exposed while the roof is off, so the sequence is planned tightly.
- Neighbours’ light and privacy are the main planning tests.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Bungalow and upward extensions: common questions
Is an upward extension permitted development?
In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.
How long does it take?
About 12 to 24 weeks on site.
How do I get a price for bungalow and upward extensions in Darlington?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Also covering
- Bungalow and upward extensions in Newton Aycliffe
- Bungalow and upward extensions in Stockton-on-Tees
- Bungalow and upward extensions in Thornaby-on-Tees
- Bungalow and upward extensions in Bishop Auckland
Learn more about bungalow and upward extensions, or see every project we cover in Darlington.