If you live in Didcot and want bungalow and upward extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Didcot

Our coverage around Didcot (OX11) also includes Abingdon (5 miles to the north) and Wantage.

Homes in the South East

Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.

What goes into an upward extension?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Structural survey of walls and foundations
  • Design and planning or prior approval application
  • Full fit-out of the new rooms

How much should I budget for an upward extension?

What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

What approvals does an upward extension need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What should I think about before starting?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The staircase takes space from the ground floor plan.

How does the project run?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Bungalow and upward extensions: common questions

Do we need to move out?

Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.

How long does it take?

About 12 to 24 weeks on site.

Do you work in Didcot?

Yes. Didcot is within our coverage for bungalow and upward extensions, along with nearby Abingdon and Wantage.

Also covering

Learn more about bungalow and upward extensions, or see every project we cover in Didcot.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote