Covering Droylsden
We work in Droylsden (M43) and the places around it, including Denton, Ashton-under-Lyne and Dukinfield.
Homes in the North West
The North West has long rows of Victorian terraced houses in its towns and cities, alongside inter-war semis and post-war estates, so rear extensions, dormer lofts and kitchen extensions are common projects.
What is included in an upward extension in Droylsden?
An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.
- Roof removal and temporary weather protection
- New first-floor structure, walls and roof
- Staircase and changes to the ground floor layout
How much does an upward extension cost in Droylsden?
What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Do you need permission for an upward extension in Droylsden?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.
What should I think about before starting?
- Some bungalow foundations need strengthening before a storey can be added.
- The staircase takes space from the ground floor plan.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
What people ask before starting
Do we need to move out?
Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.
How long does it take?
About 12 to 24 weeks on site.
How do I get a price for bungalow and upward extensions in Droylsden?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Other towns nearby
- Bungalow and upward extensions in Denton
- Bungalow and upward extensions in Ashton-under-Lyne
- Bungalow and upward extensions in Dukinfield
- Bungalow and upward extensions in Hyde
Learn more about bungalow and upward extensions, or see every project we cover in Droylsden.

