Covering Dumfries and Galloway
Our coverage across Dumfries and Galloway includes Dumfries, Stranraer, Annan and Dalbeattie.
Because Dumfries and Galloway covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in Dumfries and Galloway
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What is included in an upward extension in Dumfries and Galloway?
An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.
- Building warrant application and completion certificate
- New first-floor structure, walls and roof
- Staircase and changes to the ground floor layout
What will an upward extension cost?
Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
What approvals does an upward extension need in Scotland?
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
Adding a storey in Scotland needs planning permission and a building warrant.
What can affect an upward extension?
- Some bungalow foundations need strengthening before a storey can be added.
- The house is exposed while the roof is off, so the sequence is planned tightly.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Do we need to move out?
Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.
How long does it take?
About 12 to 24 weeks on site.
Who deals with the council for a project in Dumfries and Galloway?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Other towns nearby
- Bungalow and upward extensions in Dumfries
- Bungalow and upward extensions in Stranraer
- Bungalow and upward extensions in Annan
- Bungalow and upward extensions in Dalbeattie
Learn more about bungalow and upward extensions, or see every project we cover in Dumfries and Galloway.