Covering Eastleigh
Our coverage around Eastleigh (SO50, SO97) also includes Southampton, Winchester and Totton.
Homes in the South East
The South East has a lot of 1930s and post-war semi-detached housing, well suited to rear extensions and hip-to-gable loft conversions, alongside period properties in conservation areas that need a more careful design.
What is an upward extension?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Roof removal and temporary weather protection
- New first-floor structure, walls and roof
- Staircase and changes to the ground floor layout
What is the guide price for an upward extension in Eastleigh?
Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
What approvals does an upward extension need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.
What can change the price or programme?
- Some bungalow foundations need strengthening before a storey can be added.
- Neighbours’ light and privacy are the main planning tests.
What happens after I enquire?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Do we need to move out?
Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.
How long does it take?
About 12 to 24 weeks on site.
Do you work in Eastleigh?
Yes. Eastleigh is within our coverage for bungalow and upward extensions, along with nearby Southampton and Winchester.
Other towns nearby
- Bungalow and upward extensions in Southampton
- Bungalow and upward extensions in Winchester
- Bungalow and upward extensions in Totton
- Bungalow and upward extensions in Fareham
Learn more about bungalow and upward extensions, or see every project we cover in Eastleigh.