Covering Heywood
Heywood sits 8 miles north of Manchester, with Middleton 3 miles to the south and Rochdale 3 miles to the north-east.
Homes in the North West
The North West has long rows of Victorian terraced houses in its towns and cities, alongside inter-war semis and post-war estates, so rear extensions, dormer lofts and kitchen extensions are common projects.
What does an upward extension involve?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Structural survey of walls and foundations
- Staircase and changes to the ground floor layout
- Full fit-out of the new rooms
How much does an upward extension cost in Heywood?
Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
How is an upward extension approved in Heywood?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.
What can affect an upward extension?
- Some bungalow foundations need strengthening before a storey can be added.
- The staircase takes space from the ground floor plan.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Can I add a first floor to my bungalow?
Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.
How long does it take?
About 12 to 24 weeks on site.
Who deals with the council for a project in Heywood?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Bungalow and upward extensions near Heywood
- Bungalow and upward extensions in Middleton
- Bungalow and upward extensions in Rochdale
- Bungalow and upward extensions in Bury
- Bungalow and upward extensions in Royton
Learn more about bungalow and upward extensions, or see every project we cover in Heywood.

