Bungalow and upward extensions in Liverpool

Our bungalow and upward extensions service covers Liverpool and the rest of Merseyside. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Liverpool

We work in Liverpool (L1, L2, L3) and the places around it, including Birkenhead, Wallasey and Litherland.

Homes in the North West

Across the North West, Victorian terraces, inter-war semis and modern estates all feature, and brick or stone matching is chosen to suit each street.

What goes into an upward extension?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Design and planning or prior approval application
  • Staircase and changes to the ground floor layout
  • Full fit-out of the new rooms

How much should I budget for an upward extension?

Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Planning and building rules in Liverpool

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.

What should Liverpool homeowners check first?

  • The house is exposed while the roof is off, so the sequence is planned tightly.
  • Neighbours’ light and privacy are the main planning tests.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

What people ask before starting

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

How long does it take?

About 12 to 24 weeks on site.

Do you work in Liverpool?

Yes. Liverpool is within our coverage for bungalow and upward extensions, along with nearby Birkenhead and Wallasey.

Also covering

Learn more about bungalow and upward extensions, or see every project we cover in Liverpool.