What goes into an upward extension?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Design and planning or prior approval application
- Roof removal and temporary weather protection
- New first-floor structure, walls and roof
What will an upward extension cost?
Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Do you need permission for an upward extension in Market Harborough?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.
What can change the price or programme?
- The staircase takes space from the ground floor plan.
- The house is exposed while the roof is off, so the sequence is planned tightly.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Bungalow and upward extensions: common questions
Do we need to move out?
Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.
How long does it take?
About 12 to 24 weeks on site.
Do you work in Market Harborough?
Yes. Market Harborough is within our coverage for bungalow and upward extensions, along with nearby Corby and Kettering.
Bungalow and upward extensions near Market Harborough
- Bungalow and upward extensions in Corby
- Bungalow and upward extensions in Kettering
- Bungalow and upward extensions in Wigston
- Bungalow and upward extensions in Oadby
Learn more about bungalow and upward extensions, or see every project we cover in Market Harborough.