What goes into an upward extension?
An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.
- Roof removal and temporary weather protection
- Staircase and changes to the ground floor layout
- Full fit-out of the new rooms
How much does an upward extension cost in Newcastle-under-Lyme?
Guide prices for bungalow and upward extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Planning and building rules in Newcastle-under-Lyme
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.
What can change the price or programme?
- The staircase takes space from the ground floor plan.
- Neighbours’ light and privacy are the main planning tests.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Your questions answered
Can I add a first floor to my bungalow?
Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.
How long does it take?
About 12 to 24 weeks on site.
Do you work in Newcastle-under-Lyme?
Yes. Newcastle-under-Lyme is within our coverage for bungalow and upward extensions, along with nearby Stoke-on-Trent and Longton.
Bungalow and upward extensions in nearby towns
- Bungalow and upward extensions in Stoke-on-Trent
- Bungalow and upward extensions in Longton
- Bungalow and upward extensions in Kidsgrove
- Bungalow and upward extensions in Crewe
Learn more about bungalow and upward extensions, or see every project we cover in Newcastle-under-Lyme.