What does an upward extension involve?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Structural survey of walls and foundations
- Roof removal and temporary weather protection
- Staircase and changes to the ground floor layout
How much does an upward extension cost in Ossett?
Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Do you need permission for an upward extension in Ossett?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.
What can change the price or programme?
- The staircase takes space from the ground floor plan.
- Neighbours’ light and privacy are the main planning tests.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Bungalow and upward extensions: common questions
Is an upward extension permitted development?
In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.
How long does it take?
About 12 to 24 weeks on site.
Do you work in Ossett?
Yes. Ossett is within our coverage for bungalow and upward extensions, along with nearby Dewsbury and Batley.
Also covering
- Bungalow and upward extensions in Dewsbury
- Bungalow and upward extensions in Batley
- Bungalow and upward extensions in Wakefield
- Bungalow and upward extensions in Morley
Learn more about bungalow and upward extensions, or see every project we cover in Ossett.