Bungalow and upward extensions · Oswestry

Bungalow and upward extensions in Oswestry

Planning bungalow and upward extensions in Oswestry? We design and build them for houses across Shropshire, and we fix the price for the agreed specification in writing before any building work starts.

Covering Oswestry

Our coverage around Oswestry (SY11) also includes Rhosllannerchrugog (10 miles to the north) and Wrexham.

Homes in the West Midlands

The West Midlands has a large stock of 1930s semis and Victorian terraces in red brick, so matching brick and roof tiles is often the key to an extension that looks original.

What does an upward extension involve?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Roof removal and temporary weather protection
  • New first-floor structure, walls and roof
  • Full fit-out of the new rooms

What will an upward extension cost?

What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Planning and building rules in Oswestry

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.

What should I think about before starting?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The staircase takes space from the ground floor plan.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

How long does it take?

About 12 to 24 weeks on site.

Who deals with the council for a project in Oswestry?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Bungalow and upward extensions near Oswestry

Learn more about bungalow and upward extensions, or see every project we cover in Oswestry.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote