Bungalow and upward extensions in Preston

Homeowners in Preston can get bungalow and upward extensions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Preston

We work in Preston (PR0, PR1, PR11) and the places around it, including Leyland, Chorley and Blackburn.

Homes in the North West

Terraced housing is a defining feature of many North West towns, which brings party walls and narrow access into most projects, with more space to extend on suburban semis.

What goes into an upward extension?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Structural survey of walls and foundations
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

What will an upward extension cost?

Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Planning and building rules in Preston

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What can affect an upward extension?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The house is exposed while the roof is off, so the sequence is planned tightly.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Do we need to move out?

Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.

How long does it take?

About 12 to 24 weeks on site.

Who deals with the council for a project in Preston?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Bungalow and upward extensions near Preston

Learn more about bungalow and upward extensions, or see every project we cover in Preston.