Homes in the South East
Housing across the South East mixes inter-war semis, post-war estates and older cottages in villages and market towns, so rear and side extensions, hip-to-gable lofts and garage conversions all come up regularly.
What is included in an upward extension in Redhill?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Design and planning or prior approval application
- New first-floor structure, walls and roof
- Full fit-out of the new rooms
What is the guide price for an upward extension in Redhill?
What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
What approvals does an upward extension need in England?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.
What should I think about before starting?
- The staircase takes space from the ground floor plan.
- Neighbours’ light and privacy are the main planning tests.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.
Questions about an upward extension in Redhill
Do we need to move out?
Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.
How long does it take?
About 12 to 24 weeks on site.
Who deals with the council for a project in Redhill?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Bungalow and upward extensions in nearby towns
- Bungalow and upward extensions in Reigate
- Bungalow and upward extensions in Horley
- Bungalow and upward extensions in Coulsdon
- Bungalow and upward extensions in Banstead
Learn more about bungalow and upward extensions, or see every project we cover in Redhill.