Covering Stonehaven
We work in Stonehaven (AB39) and the places around it, including Banchory, Aberdeen and Montrose.
Homes in Aberdeen and Aberdeenshire
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What goes into an upward extension?
An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.
- Roof removal and temporary weather protection
- New first-floor structure, walls and roof
- Full fit-out of the new rooms
How much should I budget for an upward extension?
Guide prices for bungalow and upward extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Planning and building rules in Stonehaven
In Scotland the key step is the building warrant, which must be granted before work begins. Planning permission is decided separately by the council, and work on shared walls is handled under your title deeds rather than a party wall act.
Adding a storey in Scotland needs planning permission and a building warrant.
What should Stonehaven homeowners check first?
- Some bungalow foundations need strengthening before a storey can be added.
- Neighbours’ light and privacy are the main planning tests.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Can I add a first floor to my bungalow?
Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.
How long does it take?
About 12 to 24 weeks on site.
Who deals with the council for a project in Stonehaven?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Bungalow and upward extensions in Banchory
- Bungalow and upward extensions in Aberdeen
- Bungalow and upward extensions in Montrose
- Bungalow and upward extensions in Inverurie
Learn more about bungalow and upward extensions, or see every project we cover in Stonehaven.

