Covering Stourbridge
Stourbridge is about 10 miles west of Birmingham. We also cover Brierley Hill (2 miles to the north-east), Dudley and Halesowen.
Homes in the West Midlands
Across the West Midlands, terraced and semi-detached houses in red brick are typical, along with post-war estates where garage conversions and side extensions are popular.
What is included in an upward extension in Stourbridge?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Design and planning or prior approval application
- Roof removal and temporary weather protection
- New first-floor structure, walls and roof
How much does an upward extension cost in Stourbridge?
Indicative costs for bungalow and upward extensions. London and the South East usually sit towards the top of each range.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
How is an upward extension approved in Stourbridge?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.
What can affect an upward extension?
- Some bungalow foundations need strengthening before a storey can be added.
- The house is exposed while the roof is off, so the sequence is planned tightly.
From first call to completion
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Can I add a first floor to my bungalow?
Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.
Do we need to move out?
Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.
Do you work in Stourbridge?
Yes. Stourbridge is within our coverage for bungalow and upward extensions, along with nearby Brierley Hill and Dudley.
Also covering
- Bungalow and upward extensions in Brierley Hill
- Bungalow and upward extensions in Dudley
- Bungalow and upward extensions in Halesowen
- Bungalow and upward extensions in Tipton
Learn more about bungalow and upward extensions, or see every project we cover in Stourbridge.