Bungalow and upward extensions · Troon

Bungalow and upward extensions in Troon

We take on bungalow and upward extensions in Troon as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Troon

Alongside Troon, we also cover Prestwick, Irvine (5 miles to the north) and Ayr.

Homes in Ayrshire

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What do you get with an upward extension?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Roof removal and temporary weather protection
  • New first-floor structure, walls and roof
  • Full fit-out of the new rooms

How much should I budget for an upward extension?

What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Planning and building rules in Troon

Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.

Adding a storey in Scotland needs planning permission and a building warrant.

What can change the price or programme?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The staircase takes space from the ground floor plan.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Your questions answered

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

How long does it take?

About 12 to 24 weeks on site.

Do you work in Troon?

Yes. Troon is within our coverage for bungalow and upward extensions, along with nearby Prestwick and Irvine.

Bungalow and upward extensions in nearby towns

Learn more about bungalow and upward extensions, or see every project we cover in Troon.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote