Bungalow and upward extensions · Warrington

Bungalow and upward extensions in Warrington

If you live in Warrington and want bungalow and upward extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Warrington

Alongside Warrington, we also cover Great Sankey, Newton-le-Willows (4 miles to the north) and Golborne.

Homes in the North West

Terraced housing is a defining feature of many North West towns, which brings party walls and narrow access into most projects, with more space to extend on suburban semis.

What is included in an upward extension in Warrington?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Design and planning or prior approval application
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

What will an upward extension cost?

Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

What approvals does an upward extension need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.

What can affect an upward extension?

  • The staircase takes space from the ground floor plan.
  • The house is exposed while the roof is off, so the sequence is planned tightly.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

Can I add a first floor to my bungalow?

Often yes, if the walls and foundations can carry the load and planning allows. We check the structure first.

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

Can you visit a house in Warrington to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Also covering

Learn more about bungalow and upward extensions, or see every project we cover in Warrington.