Alongside Wellingborough, we also cover Rushden, Kettering (7 miles to the north) and Northampton.
Homes in the East Midlands
The East Midlands combines red-brick terraces in the cities with a lot of post-war and modern estate housing, so rear extensions, garage conversions and loft conversions are all common.
What is included in an upward extension in Wellingborough?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Design and planning or prior approval application
- Roof removal and temporary weather protection
- Full fit-out of the new rooms
How much does an upward extension cost in Wellingborough?
Guide prices for bungalow and upward extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Do you need permission for an upward extension in Wellingborough?
In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.
What should I think about before starting?
- The staircase takes space from the ground floor plan.
- The house is exposed while the roof is off, so the sequence is planned tightly.
What happens after I enquire?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Is an upward extension permitted development?
In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.
How long does it take?
About 12 to 24 weeks on site.
Do you work in Wellingborough?
Yes. Wellingborough is within our coverage for bungalow and upward extensions, along with nearby Rushden and Kettering.
Other towns nearby
- Bungalow and upward extensions in Rushden
- Bungalow and upward extensions in Kettering
- Bungalow and upward extensions in Northampton
- Bungalow and upward extensions in Corby
Learn more about bungalow and upward extensions, or see every project we cover in Wellingborough.