Covering Wellington
Our coverage around Wellington (TF1) also includes Telford (3 miles to the south-east) and Shrewsbury.
Homes in the West Midlands
Across the West Midlands, terraced and semi-detached houses in red brick are typical, along with post-war estates where garage conversions and side extensions are popular.
What goes into an upward extension?
An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.
- Roof removal and temporary weather protection
- New first-floor structure, walls and roof
- Full fit-out of the new rooms
What is the guide price for an upward extension in Wellington?
What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
Planning and building rules in Wellington
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.
What can change the price or programme?
- Some bungalow foundations need strengthening before a storey can be added.
- The house is exposed while the roof is off, so the sequence is planned tightly.
What are the steps?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Bungalow and upward extensions: common questions
Is an upward extension permitted development?
In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.
How long does it take?
About 12 to 24 weeks on site.
Can you visit a house in Wellington to quote?
Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.
Bungalow and upward extensions near Wellington
- Bungalow and upward extensions in Telford
- Bungalow and upward extensions in Shrewsbury
- Bungalow and upward extensions in Bridgnorth
- Bungalow and upward extensions in Market Drayton
Learn more about bungalow and upward extensions, or see every project we cover in Wellington.

