Bungalow and upward extensions · Wellington

Bungalow and upward extensions in Wellington

Our bungalow and upward extensions service covers Wellington and the rest of Shropshire. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Wellington

Our coverage around Wellington (TF1) also includes Telford (3 miles to the south-east) and Shrewsbury.

Homes in the West Midlands

Across the West Midlands, terraced and semi-detached houses in red brick are typical, along with post-war estates where garage conversions and side extensions are popular.

What goes into an upward extension?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Roof removal and temporary weather protection
  • New first-floor structure, walls and roof
  • Full fit-out of the new rooms

What is the guide price for an upward extension in Wellington?

What bungalow and upward extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Planning and building rules in Wellington

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What can change the price or programme?

  • Some bungalow foundations need strengthening before a storey can be added.
  • The house is exposed while the roof is off, so the sequence is planned tightly.

What are the steps?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Bungalow and upward extensions: common questions

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

How long does it take?

About 12 to 24 weeks on site.

Can you visit a house in Wellington to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Bungalow and upward extensions near Wellington

Learn more about bungalow and upward extensions, or see every project we cover in Wellington.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote