Bungalow and upward extensions · Westhoughton

Bungalow and upward extensions in Westhoughton

If you live in Westhoughton and want bungalow and upward extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Westhoughton

Alongside Westhoughton, we also cover Atherton, Hindley (3 miles to the south-west) and Tyldesley.

Homes in the North West

Terraced housing is a defining feature of many North West towns, which brings party walls and narrow access into most projects, with more space to extend on suburban semis.

What goes into an upward extension?

An upward extension adds a new storey on top of an existing house, most often turning a bungalow into a two-storey or chalet-style home. It can double the floor area without using any of the garden.

  • Structural survey of walls and foundations
  • New first-floor structure, walls and roof
  • Staircase and changes to the ground floor layout

How much should I budget for an upward extension?

Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Do you need permission for an upward extension in Westhoughton?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What can affect an upward extension?

  • Some bungalow foundations need strengthening before a storey can be added.
  • Neighbours’ light and privacy are the main planning tests.

What happens after I enquire?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Your questions answered

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

How long does it take?

About 12 to 24 weeks on site.

Who deals with the council for a project in Westhoughton?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Also covering

Learn more about bungalow and upward extensions, or see every project we cover in Westhoughton.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote