Bungalow and upward extensions · Weston-super-Mare

Bungalow and upward extensions in Weston-super-Mare

Homeowners in Weston-super-Mare can get bungalow and upward extensions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Weston-super-Mare

Our coverage around Weston-super-Mare (BS23) also includes Burnham-on-Sea, Clevedon and Penarth.

Homes in the South West

The South West mixes stone and render cottages, Victorian terraces in the larger towns and modern estates, and many historic centres are conservation areas where materials and roof shapes are closely controlled.

What does an upward extension involve?

The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.

  • Structural survey of walls and foundations
  • Roof removal and temporary weather protection
  • Staircase and changes to the ground floor layout

What will an upward extension cost?

Typical ranges for bungalow and upward extensions. Ground conditions, access and specification move the final figure, which we fix in writing before work starts.

Bungalow and upward extensionsGuide price incl. VAT
Chalet conversion with dormers (total)£45,000 to £85,000
New first floor, standard specification£2,200 to £2,800 per m²
New first floor, good specification£2,800 to £3,300 per m²
New first floor, high specification£3,300 to £3,800 per m²

Planning and building rules in Weston-super-Mare

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters.

What should Weston-super-Mare homeowners check first?

  • The house is exposed while the roof is off, so the sequence is planned tightly.
  • Neighbours’ light and privacy are the main planning tests.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Bungalow and upward extensions: common questions

Is an upward extension permitted development?

In England, Class AA allows it on many post-1948 houses through a prior approval application. Elsewhere planning permission is needed.

How long does it take?

About 12 to 24 weeks on site.

Who deals with the council for a project in Weston-super-Mare?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Bungalow and upward extensions near Weston-super-Mare

Learn more about bungalow and upward extensions, or see every project we cover in Weston-super-Mare.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote