Covering Woking
Our coverage around Woking (GU22) also includes Guildford, Egham and Walton-on-Thames.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What goes into an upward extension?
The first question is whether the existing walls and foundations can carry the extra load, so we start with a structural survey. Then we design either a full first floor or a raised roof with dormers, handle planning or prior approval, and build the new storey while protecting the floor below.
- Structural survey of walls and foundations
- New first-floor structure, walls and roof
- Staircase and changes to the ground floor layout
How much does an upward extension cost in Woking?
Use these ranges to budget for bungalow and upward extensions; the survey turns them into a fixed price for the agreed specification.
| Bungalow and upward extensions | Guide price incl. VAT |
|---|---|
| Chalet conversion with dormers (total) | £45,000 to £85,000 |
| New first floor, standard specification | £2,200 to £2,800 per m² |
| New first floor, good specification | £2,800 to £3,300 per m² |
| New first floor, high specification | £3,300 to £3,800 per m² |
What approvals does an upward extension need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
In England, Class AA permitted development allows an extra storey on many detached and semi-detached houses built between July 1948 and October 2018, subject to a prior approval application covering design, neighbours’ amenity and other matters. Houses in conservation areas and other protected land need full planning permission, as do most chalet conversions with front dormers.
What can change the price or programme?
- The house is exposed while the roof is off, so the sequence is planned tightly.
- Neighbours’ light and privacy are the main planning tests.
How does the project run?
- Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
Do we need to move out?
Often for part of the job, while the roof is off and the new floor is formed. We plan this with you.
How long does it take?
About 12 to 24 weeks on site.
Do you work in Woking?
Yes. Woking is within our coverage for bungalow and upward extensions, along with nearby Guildford and Egham.
Bungalow and upward extensions near Woking
- Bungalow and upward extensions in Guildford
- Bungalow and upward extensions in Egham
- Bungalow and upward extensions in Walton-on-Thames
- Bungalow and upward extensions in Camberley
Learn more about bungalow and upward extensions, or see every project we cover in Woking.