Covering Fleet
We work in Fleet (GU13, GU51, GU52) and the places around it, including Farnborough, Aldershot and Farnham.
Homes in the South East
Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.
What does a dormer loft conversion involve?
A dormer loft conversion builds a box-shaped extension out from the rear slope of the roof, creating vertical walls and full head height across most of the new floor. It is the most popular type of loft conversion because it gives the most usable space for the cost.
- Lawful development certificate or planning drawings
- Staircase, insulation and plasterboard
- En-suite, electrics and fire-protected escape route
What is the guide price for a dormer loft conversion in Fleet?
Guide prices for dormer loft conversions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Dormer loft conversions | Guide price incl. VAT |
|---|---|
| Rear dormer, bedroom only | £50,000 to £65,000 |
| Full-width dormer with en-suite | £60,000 to £80,000 |
| L-shaped dormer (over rear outrigger) | £65,000 to £90,000 |
How is a dormer loft conversion approved in Fleet?
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
In England many loft conversions are permitted development: the extra roof volume must stay within 40 m³ on a terraced house or 50 m³ on a semi or detached house, nothing can sit higher than the existing ridge, no dormer can face a road on the main elevation, and side windows must be obscure-glazed and non-opening below 1.7 m. Houses in conservation areas, National Parks and National Landscapes cannot use these roof-extension rights, so dormers there need planning permission (a rooflight-only conversion can still be permitted development), and flats always need permission.
What can change the price or programme?
- Dormer cheeks close to a shared wall can trigger the Party Wall Act.
- L-shaped dormers are common on Victorian terraces with a rear outrigger.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
What people ask before starting
Is a dormer permitted development?
Rear dormers in England often are, within the 40 m³ (terrace) or 50 m³ (semi or detached) volume allowance. Front dormers facing a road are not.
How long does a dormer conversion take?
Around 8 to 12 weeks on site.
Who deals with the council for a project in Fleet?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Also covering
- Dormer loft conversions in Farnborough
- Dormer loft conversions in Aldershot
- Dormer loft conversions in Farnham
- Dormer loft conversions in Camberley
Learn more about dormer loft conversions, or see every project we cover in Fleet.

