Double-storey extensions · Annan

Double-storey extensions in Annan

We take on double-storey extensions in Annan as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Annan

Alongside Annan, we also cover Carlisle, Dumfries (15 miles to the west) and Dalbeattie.

Projects in Dumfries and Galloway are taken on by arrangement, and any travel and accommodation costs for the team are shown openly in the quote.

Homes in Dumfries and Galloway

Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.

What goes into a double-storey extension?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Building warrant application and completion certificate
  • Householder planning application
  • Windows, insulation, plastering, electrics and plumbing

How much should I budget for a double-storey extension?

Guide prices for double-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

What approvals does a double-storey extension need in Scotland?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

Two-storey extensions in Scotland almost always need planning permission, and a building warrant must be granted before work starts.

What can change the price or programme?

  • The new roof is tied into the old one, so roof tiles and ridge details need to match.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

What are the steps?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Double-storey extensions: common questions

Is a two-storey extension better value than a single-storey one?

Per square metre, usually yes, because the foundations and roof serve two floors of space.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Who deals with the council for a project in Annan?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Double-storey extensions near Annan

Learn more about double-storey extensions, or see every project we cover in Annan.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote