Double-storey extensions · Arnold

Double-storey extensions in Arnold

We take on double-storey extensions in Arnold as a complete project: survey, drawings, planning or permitted development checks, building control and the construction itself.

Covering Arnold

Our coverage around Arnold (NG5) also includes Nottingham, Hucknall and West Bridgford.

Homes in the East Midlands

Housing in the East Midlands includes Victorian terraces, inter-war semis and newer estates, with stone-built villages in some areas where conservation controls apply.

What does a double-storey extension involve?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Householder planning application
  • Foundations, steelwork, brick and block walls, roof
  • Joining the new first floor to the existing landing

How much should I budget for a double-storey extension?

Use these ranges to budget for double-storey extensions; the survey turns them into a fixed price for the agreed specification.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

Do you need permission for a double-storey extension in Arnold?

English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What should I think about before starting?

  • Neighbours’ light is assessed using the 45-degree guide many councils use.
  • The new roof is tied into the old one, so roof tiles and ridge details need to match.

From first call to completion

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about a double-storey extension in Arnold

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Will we need to move out?

Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.

Can you visit a house in Arnold to quote?

Yes. After a short call we arrange a site visit to measure up and agree what the design needs to do, then send a written price.

Double-storey extensions near Arnold

Learn more about double-storey extensions, or see every project we cover in Arnold.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote