Double-storey extensions · Brent

Double-storey extensions in Brent

If you live in Brent and want double-storey extensions, we can take the whole job off your hands, from measuring the house to handing over a finished room.

Covering Brent

We work in Brent (HA9) and the places around it, including Wembley, Harrow and Greenford.

Homes in London

London projects often mean working on period terraces with neighbours on both sides, tight access through the house and conservation area controls, so careful planning and party wall work matter as much as the build.

What goes into a double-storey extension?

A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.

  • Householder planning application
  • Windows, insulation, plastering, electrics and plumbing
  • Joining the new first floor to the existing landing

What is the guide price for a double-storey extension in Brent?

Indicative costs for double-storey extensions. London and the South East usually sit towards the top of each range.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

What approvals does a double-storey extension need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What can affect a double-storey extension?

  • Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

What are the steps?

  1. Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

Questions about a double-storey extension in Brent

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Will we need to move out?

Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.

Do you work in Brent?

Yes. Brent is within our coverage for double-storey extensions, along with nearby Wembley and Harrow.

Double-storey extensions near Brent

Learn more about double-storey extensions, or see every project we cover in Brent.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote