Double-storey extensions · Canning Town

Double-storey extensions in Canning Town

Homeowners in Canning Town can get double-storey extensions from one company: the design, the paperwork and the building work sit with us rather than with three separate firms.

Covering Canning Town

Canning Town sits 6 miles east of London, with Stratford 2 miles to the north-west and Bow 2 miles to the north-west.

Homes in London

Much of London’s housing is Victorian and Edwardian terraces, which is why side return extensions, rear dormers and mansards are so common. Many streets are in conservation areas, and several boroughs use Article 4 directions that remove some permitted development rights.

What is a double-storey extension?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Foundations, steelwork, brick and block walls, roof
  • Windows, insulation, plastering, electrics and plumbing
  • Joining the new first floor to the existing landing

What will a double-storey extension cost?

Use these ranges to budget for double-storey extensions; the survey turns them into a fixed price for the agreed specification.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

What approvals does a double-storey extension need in England?

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission.

What should I think about before starting?

  • The new roof is tied into the old one, so roof tiles and ridge details need to match.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Construction and completion. One site lead co-ordinates every trade through to the building control certificate.

What people ask before starting

Does a two-storey extension need planning permission?

Usually yes. In England some two-storey rear extensions are permitted development, but side extensions over one storey always need planning permission.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Who deals with the council for a project in Canning Town?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about double-storey extensions, or see every project we cover in Canning Town.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote