Double-storey extensions · Carmarthen

Double-storey extensions in Carmarthen

Planning double-storey extensions in Carmarthen? We design and build them for houses across Dyfed, and we fix the price for the agreed specification in writing before any building work starts.

Covering Carmarthen

Our coverage around Carmarthen (SA31) also includes Llanelli, Ammanford and Pontarddulais.

Homes in Dyfed

Housing in Wales ranges from terraced streets in the valleys and older industrial towns to stone-built homes in rural areas and modern estates around the cities.

What do you get with a double-storey extension?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Structural engineer’s design and calculations
  • Foundations, steelwork, brick and block walls, roof
  • Windows, insulation, plastering, electrics and plumbing

How much should I budget for a double-storey extension?

Guide prices for double-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

How is a double-storey extension approved in Carmarthen?

In Wales the planning rules, including what counts as permitted development, are set by the Welsh Government, and Welsh building regulations differ in places from England’s. We check both against your house before drawings are finalised, and handle party wall notices where needed.

Most two-storey extensions in Wales need householder planning permission from the council. We prepare and submit the application and deal with any questions from the planning officer.

What should Carmarthen homeowners check first?

  • The new roof is tied into the old one, so roof tiles and ridge details need to match.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Questions about a double-storey extension in Carmarthen

Is a two-storey extension better value than a single-storey one?

Per square metre, usually yes, because the foundations and roof serve two floors of space.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

How do I get a price for double-storey extensions in Carmarthen?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Double-storey extensions near Carmarthen

Learn more about double-storey extensions, or see every project we cover in Carmarthen.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote