Double-storey extensions · Cheshire

Double-storey extensions in Cheshire

Homeowners across Cheshire can get double-storey extensions from one company: the design, the council approvals and the building work.

Covering Cheshire

We cover Cheshire, including Warrington, Chester, Crewe and Ellesmere Port, and the towns around them.

Homes in the North West

The North West has long rows of Victorian terraced houses in its towns and cities, alongside inter-war semis and post-war estates, so rear extensions, dormer lofts and kitchen extensions are common projects.

What is a double-storey extension?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Measured survey, design and planning drawings
  • Structural engineer’s design and calculations
  • Foundations, steelwork, brick and block walls, roof

What will a double-storey extension cost?

Guide prices for double-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

Planning and building rules in Cheshire

Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What can affect a double-storey extension?

  • Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

How does the project run?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Design and fixed price. You get drawings and a written price for the agreed specification before anything is ordered.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Questions about a double-storey extension in Cheshire

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Will we need to move out?

Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.

Who deals with the council for a project in Cheshire?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Other towns nearby

Learn more about double-storey extensions, or see every project we cover in Cheshire.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote