Covering Cramlington
Our coverage around Cramlington (NE23) also includes Bedlington, Blyth and Gosforth.
Because Northumberland covers a wide area, we confirm availability after the first call and include any travel costs in the written quote rather than adding them later.
Homes in the North East
Housing across the North East ranges from colliery terraces and Tyneside flats to suburban semis and modern estates, each with different options for extending.
What goes into a double-storey extension?
Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.
- Measured survey, design and planning drawings
- Structural engineer’s design and calculations
- Foundations, steelwork, brick and block walls, roof
How much does a double-storey extension cost in Cramlington?
What double-storey extensions typically cost. These are guide ranges; the written quote for your house replaces them.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
What approvals does a double-storey extension need in England?
Projects in England go through two separate checks. Planning (or confirmation that the work is permitted development) comes from the district, borough or unitary council, and building regulations approval comes from the council’s building control team or a registered building control approver. Where work touches a shared wall or digs near a neighbour’s foundations, the Party Wall etc. Act 1996 applies.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission.
What can change the price or programme?
- Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
- The first-floor link can mean moving a bathroom or reshaping the landing.
From first call to completion
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
Double-storey extensions: common questions
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Will we need to move out?
Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.
Who deals with the council for a project in Cramlington?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Double-storey extensions near Cramlington
- Double-storey extensions in Bedlington
- Double-storey extensions in Blyth
- Double-storey extensions in Gosforth
- Double-storey extensions in Ashington
Learn more about double-storey extensions, or see every project we cover in Cramlington.

