Double-storey extensions · East Grinstead

Double-storey extensions in East Grinstead

Our double-storey extensions service covers East Grinstead and the rest of West Sussex. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering East Grinstead

Our coverage around East Grinstead (RH19) also includes Horley, Crawley and Crowborough.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What does a double-storey extension involve?

A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.

  • Householder planning application
  • Windows, insulation, plastering, electrics and plumbing
  • Joining the new first floor to the existing landing

What will a double-storey extension cost?

What double-storey extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

What approvals does a double-storey extension need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What can affect a double-storey extension?

  • Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
  • The new roof is tied into the old one, so roof tiles and ridge details need to match.

What happens after I enquire?

  1. Send us the details. Give us a postcode, a rough idea of size and some photos, by phone, form or the guide price tool.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
  4. We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.

Questions about a double-storey extension in East Grinstead

Does a two-storey extension need planning permission?

Usually yes. In England some two-storey rear extensions are permitted development, but side extensions over one storey always need planning permission.

Is a two-storey extension better value than a single-storey one?

Per square metre, usually yes, because the foundations and roof serve two floors of space.

Do you work in East Grinstead?

Yes. East Grinstead is within our coverage for double-storey extensions, along with nearby Horley and Crawley.

Also covering

Learn more about double-storey extensions, or see every project we cover in East Grinstead.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote