Double-storey extensions · Lanarkshire

Double-storey extensions in Lanarkshire

Looking for double-storey extensions in Lanarkshire? We take projects from the first visit to the final sign-off, and confirm the price in writing first.

Covering Lanarkshire

Our coverage across Lanarkshire includes East Kilbride, Hamilton, Cumbernauld and Coatbridge.

Homes in Lanarkshire

In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.

What does a double-storey extension involve?

A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.

  • Building warrant application and completion certificate
  • Windows, insulation, plastering, electrics and plumbing
  • Joining the new first floor to the existing landing

What is the guide price for a double-storey extension in Lanarkshire?

What double-storey extensions typically cost. These are guide ranges; the written quote for your house replaces them.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

How is a double-storey extension approved in Lanarkshire?

Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.

Two-storey extensions in Scotland almost always need planning permission, and a building warrant must be granted before work starts.

What can affect a double-storey extension?

  • Neighbours’ light is assessed using the 45-degree guide many councils use.
  • The new roof is tied into the old one, so roof tiles and ridge details need to match.

How does the project run?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Double-storey extensions: common questions

Is a two-storey extension better value than a single-storey one?

Per square metre, usually yes, because the foundations and roof serve two floors of space.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

Who deals with the council for a project in Lanarkshire?

We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.

Double-storey extensions in nearby towns

Learn more about double-storey extensions, or see every project we cover in Lanarkshire.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote