Covering Lytham St Annes
Alongside Lytham St Annes, we also cover Blackpool, Southport (7 miles to the south) and Thornton-Cleveleys.
Homes in the North West
Terraced housing is a defining feature of many North West towns, which brings party walls and narrow access into most projects, with more space to extend on suburban semis.
What do you get with a double-storey extension?
Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.
- Measured survey, design and planning drawings
- Structural engineer’s design and calculations
- Windows, insulation, plastering, electrics and plumbing
What is the guide price for a double-storey extension in Lytham St Annes?
Indicative costs for double-storey extensions. London and the South East usually sit towards the top of each range.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
Planning and building rules in Lytham St Annes
English projects need planning clearance from the local council, building regulations sign-off from building control, and party wall notices where the work is on or near a shared boundary. We prepare and manage all three.
Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.
What should I think about before starting?
- Neighbours’ light is assessed using the 45-degree guide many councils use.
- The first-floor link can mean moving a bathroom or reshaping the landing.
How does the project run?
- Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
- Survey at your house. We look at the existing structure, services and access, and agree what the design needs to achieve.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Will we need to move out?
Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.
How do I get a price for double-storey extensions in Lytham St Annes?
Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.
Double-storey extensions in nearby towns
- Double-storey extensions in Blackpool
- Double-storey extensions in Southport
- Double-storey extensions in Thornton-Cleveleys
- Double-storey extensions in Preston
Learn more about double-storey extensions, or see every project we cover in Lytham St Annes.

