Double-storey extensions · Newbury

Double-storey extensions in Newbury

Our double-storey extensions service covers Newbury and the rest of Berkshire. You get a fixed price in writing for the agreed specification, and one person co-ordinating the trades.

Covering Newbury

We work in Newbury (RG14) and the places around it, including Thatcham, Wantage and Basingstoke.

Homes in the South East

Many South East homes are inter-war or post-war semis and detached houses with room for rear and side extensions, while historic town centres and villages bring conservation area and listed building controls.

What goes into a double-storey extension?

Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.

  • Householder planning application
  • Structural engineer’s design and calculations
  • Foundations, steelwork, brick and block walls, roof

How much does a double-storey extension cost in Newbury?

Use these ranges to budget for double-storey extensions; the survey turns them into a fixed price for the agreed specification.

Double-storey extensionsGuide price incl. VAT
Standard specification£2,400 to £2,900 per m²
Good specification£2,900 to £3,400 per m²
High specification£3,400 to £3,850 per m²

What approvals does a double-storey extension need in England?

In England we deal with the council’s planning team for permission or a lawful development certificate, with building control (the council or a registered building control approver) for inspections, and with neighbours under the Party Wall etc. Act 1996 where it applies.

Two-storey rear extensions can sometimes be permitted development in England (no more than 3 m deep, at least 7 m from the rear boundary, roof pitch to match), but most two-storey and all two-storey side extensions need householder planning permission. Expect around eight weeks for a decision once the application is validated.

What can affect a double-storey extension?

  • Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
  • The first-floor link can mean moving a bathroom or reshaping the landing.

What happens after I enquire?

  1. Start with a conversation. A short call or the online form is enough for us to understand what you want to build.
  2. Free site visit. We measure up, look at access, drains and the structure, and talk through options and budget.
  3. Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
  4. Build and hand over. Our teams build to the programme, building control inspects, and you get the completion paperwork at the end.

Double-storey extensions: common questions

Does a two-storey extension need planning permission?

Usually yes. In England some two-storey rear extensions are permitted development, but side extensions over one storey always need planning permission.

How long does a two-storey extension take?

Around 14 to 24 weeks on site, plus the planning period before that.

How do I get a price for double-storey extensions in Newbury?

Use the guide price tool for a ballpark figure, then book a visit for a fixed written price for the agreed specification.

Double-storey extensions near Newbury

Learn more about double-storey extensions, or see every project we cover in Newbury.

Planning an extension, loft or new home?

Get a guide price in two minutes, then book a free site visit.

CallGet a quote