Covering Newton Mearns
Newton Mearns is about 6 miles south-east of Paisley. We also cover Paisley (6 miles to the north-west), Rutherglen and East Kilbride.
Homes in Renfrewshire and Inverclyde
In Scotland many families extend bungalows and semis, while tenement flats bring shared ownership of roofs and walls that needs agreeing early.
What do you get with a double-storey extension?
A double-storey extension adds new rooms on both the ground and first floor in one build, typically a larger kitchen or living space downstairs and an extra bedroom or bathroom above. Because the roof and foundations are shared, the cost per square metre is usually lower than a single-storey extension.
- Householder planning application
- Structural engineer’s design and calculations
- Windows, insulation, plastering, electrics and plumbing
How much does a double-storey extension cost in Newton Mearns?
Guide prices for double-storey extensions, including VAT where it applies. Your fixed price is confirmed in writing after the survey.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
How is a double-storey extension approved in Newton Mearns?
Scottish projects follow a different process from England: the council issues a building warrant before work starts and accepts a completion certificate at the end, alongside any planning permission needed. We prepare both applications.
Two-storey extensions in Scotland almost always need planning permission, and a building warrant must be granted before work starts.
What should I think about before starting?
- Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
- The first-floor link can mean moving a bathroom or reshaping the landing.
How does the project run?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Drawings, approvals, written quote. We prepare the design, apply for the approvals it needs, and give you a fixed price in writing.
- Construction and completion. One site lead co-ordinates every trade through to the building control certificate.
What people ask before starting
Is a two-storey extension better value than a single-storey one?
Per square metre, usually yes, because the foundations and roof serve two floors of space.
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Who deals with the council for a project in Newton Mearns?
We do. We prepare the drawings, submit planning or permitted development paperwork if needed, and arrange building control inspections.
Double-storey extensions near Newton Mearns
- Double-storey extensions in Paisley
- Double-storey extensions in Rutherglen
- Double-storey extensions in East Kilbride
- Double-storey extensions in Cambuslang
Learn more about double-storey extensions, or see every project we cover in Newton Mearns.

