Covering Renfrew
We work in Renfrew (PA4) and the places around it, including Clydebank, Paisley and Bearsden.
Homes in Renfrewshire and Inverclyde
Scottish homes range from city tenements and sandstone terraces to bungalows and modern estates, and the building warrant process shapes the programme for every project.
What do you get with a double-storey extension?
Two-storey work has to sit comfortably with the house and the neighbours, so most of the design effort goes into the roofline, window positions and how the new first floor connects to the landing. We handle the planning application, the structural design and the building control process, then build, roof and finish both floors.
- Building warrant application and completion certificate
- Foundations, steelwork, brick and block walls, roof
- Windows, insulation, plastering, electrics and plumbing
How much should I budget for a double-storey extension?
Use these ranges to budget for double-storey extensions; the survey turns them into a fixed price for the agreed specification.
| Double-storey extensions | Guide price incl. VAT |
|---|---|
| Standard specification | £2,400 to £2,900 per m² |
| Good specification | £2,900 to £3,400 per m² |
| High specification | £3,400 to £3,850 per m² |
What approvals does a double-storey extension need in Scotland?
Projects in Scotland need a building warrant from the council before any building work starts, and a completion certificate once it is finished. Planning permission is a separate decision. The Party Wall etc. Act does not apply in Scotland; shared walls are governed by title deeds and the law of the tenement where relevant.
Two-storey extensions in Scotland almost always need planning permission, and a building warrant must be granted before work starts.
What can affect a double-storey extension?
- Side extensions close to a boundary are often set back or stepped down so they do not create a terraced effect.
- The first-floor link can mean moving a bathroom or reshaping the landing.
What happens after I enquire?
- Tell us about the project. Call, use the guide price tool or send the form with a few photos and a postcode.
- We visit and measure. A surveyor checks the house, the boundaries and the ground, and discusses what is realistic.
- Price and paperwork. The design is priced line by line, and we submit the planning and building control applications.
- We build it. Work follows an agreed programme, with inspections at each stage and a final sign-off.
Your questions answered
How long does a two-storey extension take?
Around 14 to 24 weeks on site, plus the planning period before that.
Will we need to move out?
Most people stay. The noisiest stage is when we break through into the existing first floor, which we plan for a short window.
Do you work in Renfrew?
Yes. Renfrew is within our coverage for double-storey extensions, along with nearby Clydebank and Paisley.
Double-storey extensions in nearby towns
- Double-storey extensions in Clydebank
- Double-storey extensions in Paisley
- Double-storey extensions in Bearsden
- Double-storey extensions in Bishopbriggs
Learn more about double-storey extensions, or see every project we cover in Renfrew.

